8 Engineering Phases
From project kickoff through final records, the checklist follows the actual sequence most BEAD teams move through before construction starts.
- Grant docs
- Field survey
- HLD
- LLD
- Permitting
- Construction readiness
- As-builts
- Closeout
What every BEAD subgrantee needs to verify before a single foot of fiber goes in the ground — organized by phase, weighted by NTIA compliance risk.
This checklist is structured to help subgrantees, PMs, and engineering teams catch documentation, design, permitting, and closeout issues before they turn into schedule delays.
From project kickoff through final records, the checklist follows the actual sequence most BEAD teams move through before construction starts.
Red-bordered checkboxes flag the engineering and records issues most likely to delay grant closeout or create clawback exposure later.
Not a generic template. This is the same kind of practical work Draftech engineers use on active BEAD projects when preparing designs for real-world execution.
Delivered as a PDF you can print and use on your project
See how Draftech supports subgrantees with real engineering deliverables before full-scale rollout.