Free BEAD Network Design — Draftech International
Questions? Call us
305-306-7407

⚠ Only 5 slots per quarter — 3 already claimed for Q2 2026. Next slots open Q3.

Free Offer — BEAD Subgrantees & Broadband Teams

We'll Design Your First
3.8 Miles of Fiber Network.
Free. No Commitment.

Production-ready CAD drawings, pole loading analysis, and a full material takeoff for your actual BEAD project — not a template, not a sample. The same work we do for paying clients.

"Most broadband teams don't have a funding problem. They have an engineering execution problem. We've seen BEAD awards sit idle for 8 months because the subgrantee couldn't find a firm that understood BEAD compliance from day one. This offer eliminates that risk — before a dollar of your budget is committed."

— Julio Martinez, CEO, Draftech International
Only 2 free design slots remaining this quarter
Claim Your Free BEAD Network Design
Takes 2 minutes. A Draftech engineer calls you within 1 business day.

You're Confirmed.

A Draftech engineer will call you within 1 business day to scope your route and discuss your project.

Check your inbox — a confirmation is on its way to your email.

No spam No commitment Respond in 1 business day MBE Certified firm
44,000+
Route Miles Designed
2.6M+
Addresses Served
22
Active States
All 50
States Available
MBE
Certified
Why We're Doing This

The Engineering Bottleneck Nobody Warned BEAD Subgrantees About

When we started working with BEAD subgrantees in 2024, we kept hearing the same story. A rural ISP or municipality wins a BEAD award — $4M, $12M, sometimes $40M. They celebrate. Then reality sets in.

Their timeline shows construction starting in 90 days. They have no engineering firm. The firms they call are already booked. The ones that aren't booked don't understand BEAD compliance documentation. And the clock on their grant is ticking.

We've seen projects lose 6–8 months sitting in this gap. We've seen subgrantees request construction bids from contractors who quoted based on guesswork because there were no actual design drawings yet. We've seen BEAD compliance reviews come back with 14 deficiencies — all engineering documentation issues.

The bottleneck isn't funding. It isn't construction capacity. It's engineering. And the easiest way to prove we can solve it — is to just solve it. For free. On your actual project.

So here's what we do: we design the first 20,000 linear feet of your route — real CAD drawings, pole loading, material takeoff — at no cost. You see exactly how we work, what our deliverables look like, and whether we understand your project. No pitch. No pressure. Just the work.

That's the offer. That's why we do it.

What's Included

Production-Grade Deliverables. Free.

You get the same work we deliver to paying clients — full-quality engineering output for the first 20,000 linear feet of your route.

📐

Production-Ready CAD Drawings

Full AutoCAD design files for the first 20,000 LF of your route. Aerial, underground, or direct bury — built to your spec and carrier standards. Plan view at 1"=50'.

Typical value: $4,200–$8,000

Pole Loading Analysis

We run O-Calc Pro pole loading for every attachment on your route. NESC compliance verified. No make-ready surprises. Delivered with your drawings.

Typical value: $1,500–$3,500
📋

Material Takeoff

Fiber, strand, hardware, splice closures — everything counted and specified so you can order materials and build a real project budget before committing.

Typical value: $800–$1,800
🗺️

GIS-Ready Route Data

Shapefile export of your route geometry with coordinate accuracy to 0.5 meters. Referenced to NAD83. Ready for your BEAD reporting and permit submissions.

Typical value: $600–$1,200
📞

Engineer Scoping Call

A Draftech OSP engineer calls within 1 business day to scope your route, review any existing data, and answer your BEAD engineering questions directly.

Typical value: $350–$500

BEAD Compliance Check

We flag any design decisions that could create issues with NTIA technical review or grant closeout documentation — before they become expensive problems.

Typical value: $500–$1,000
How It Works

Three Steps. 10–15 Business Days.

1

Submit the Form Above

Tell us your route, geography, and project scope. Takes less than 2 minutes. No long questionnaires, no RFP process.

Takes 2 minutes
2

Engineer Scoping Call

A Draftech engineer calls you within 1 business day. We scope the route, collect any existing pole records or permit data, and align on your BEAD compliance requirements.

Within 1 business day
3

Drawings Delivered

Production-ready CAD drawings, pole loading results, and material takeoff — delivered within 10–15 business days. You keep everything. No strings. No commitment to continue.

10–15 business days
We Hear These Every Day

What's Holding You Back — Answered

🤔
"Why would you do this for free?"

Because the best way to earn a client is to do the work first and let the quality speak. We've designed over 44,000 miles. We're confident you'll want to continue. If you don't — you still walk away with real drawings for your project at zero cost.

"We're not ready yet — still in planning."

That's exactly when to claim this. Engineering during the planning phase prevents the most expensive mistakes. The free design gives you real cost data, buildability confirmation, and permit readiness before you commit budget to construction.

💰
"We already have an engineering firm."

Perfect — use this as a second opinion. Compare deliverable quality, BEAD compliance accuracy, and turnaround time. You're making decisions worth millions of dollars. A second set of drawings costs you nothing and confirms you're on the right track.

📍
"We're in a state you might not cover."

Draftech is active in 22 states and available to deploy across all 50 U.S. states. We've supported projects from Florida to Montana. Your location is not a limitation.

🔒
"Will there be hidden commitments or a sales pitch?"

No. We deliver the drawings, answer your questions, and step back. If you want to continue the project with us, we'll provide a proposal. If not, the drawings are yours — no follow-up pressure, no invoice.

What Clients Say

Engineers Who've Been There

"We had a BEAD award and a 90-day clock. Draftech had drawings in our hands in 12 business days. The pole loading caught three violations our previous contractor missed entirely."

Network Engineering Director
Rural Electric Cooperative — Midwest

"I was skeptical about the free offer. The CAD files we received were indistinguishable from what we'd paid $18,000 for on a previous project. We signed a full engagement the next week."

VP of Infrastructure
Mid-size Regional ISP — Southeast

"The BEAD compliance check alone was worth it. They flagged two documentation issues before we submitted our first disbursement request. That could have been a $200,000 clawback problem."

Broadband Program Manager
State-funded Broadband Authority — Mid-Atlantic
Everything You Get

Here's The Full Value

What this package would cost at standard engineering rates:

Production-Ready CAD Drawings (20,000 LF) $4,200–$8,000
O-Calc Pro Pole Loading Analysis $1,500–$3,500
Full Material Takeoff $800–$1,800
GIS-Ready Route Shapefiles $600–$1,200
Engineer Scoping Call $350–$500
BEAD Compliance Documentation Check $500–$1,000

Total Value $7,950–$16,000
$0
Your price — 5 slots per quarter

2 Free Slots Left This Quarter.
Don't Wait.

BEAD construction timelines don't have room for 6-month engineering delays. Claim your free design now — before the slots fill and before your project window closes.

Prefer to talk first? Call 305-306-7407 or email info@draftech.com