- 01
Feasibility Study
Constructability, structure availability, right of way and the agencies your route must satisfy. An engineer scoping call establishes the route scope with you.
- 02
Field Survey
Field collection of poles, structures, existing attachments and obstructions along the first 20,000 linear feet, with GIS-ready route shapefiles.
- 03
HLD Route Planning
The proposed fiber path, route segmentation, aerial or underground design by segment, and the structure count for the build.
- 04
Make-Ready & Pole Loading
O‑Calc Pro pole loading analysis, NESC compliance verification and a defined make-ready scope for the route's attachments.
- 05
LLD & Material Takeoff
Production-ready CAD construction drawings, with fiber, strand, hardware and splice closures counted and specified in the full material takeoff.
- 06
Permit Drawings
We prepare drawings to the agency's requirements, sealed by a licensed professional engineer. Applicable stamping or sealing fees remain payable by you.
- 07
Permit Submittals
We file the package with the exhibits each agency asks for. Filing is part of the engineering offer.
- 08
Agency Handling
We handle agency questions, comments and resubmittals, carrying the package through the review process.
- 09
Permit Approval
We stay on the work through permit approval. The drawings, permit drawings and approved permit package remain yours.