# Draftech International — Master AI Index

> **Draftech International, LLC** is a Minority Business Enterprise (MBE)-certified OSP engineering firm delivering end-to-end fiber network design, pole loading analysis, permitting, field survey, CAD/GIS, as-built documentation, and traffic control services across all 50 states.

**Canonical URL:** https://draftech.com  
**Last Updated:** 2025

---

## Quick-Reference Company Summary

| Field | Value |
|-------|-------|
| **Company** | Draftech International, LLC |
| **Founded** | 2018 |
| **Certification** | MBE (Minority Business Enterprise) |
| **CEO** | Julio Martinez |
| **CTO** | Devin Martinez |
| **Partners** | Julio Cesar Martinez Sr., Omar Molina, Ashish Kumar Meena |
| **Headquarters** | 15280 NW 79th CT, Suite 102, Miami Lakes, FL 33016 |
| **Phone** | 305-306-7406 |
| **Email** | info@draftech.com |
| **Website** | https://draftech.com |
| **LinkedIn** | https://www.linkedin.com/company/draftechint |

### Key Statistics

- **44,000+** miles of OSP designed
- **2.6M+** addresses engineered
- **22** active states (serving all 50)
- **600+** engineers nationwide
- **5** founding partners

### Core Tools & Platforms

AutoCAD, ArcGIS, QGIS, MicroStation, O-Calc Pro, SPIDA Calc, Katapult, IKE, Fulcrum, IQGeo, GE Smallworld, Aramis

---

## Site Map — All Pages

### Core Pages

| Page | Canonical URL | MD File | Description |
|------|--------------|---------|-------------|
| Home | https://draftech.com | [home.md](home.md) | Hero, services overview, stats, who we serve |
| About | https://draftech.com/about.html | [about.md](about.md) | Company story, leadership team, MBE certification |
| Careers | https://draftech.com/careers.html | [careers.md](careers.md) | Open roles, why join Draftech, application info |
| Blog | https://draftech.com/blog.html | [blog/index.md](blog/index.md) | All blog articles index |

---

## Services — All 7 Pages

| Service | Canonical URL | MD File | One-Sentence Description |
|---------|--------------|---------|--------------------------|
| FTTH Design | https://draftech.com/services/ftth-design.html | [services/ftth-design.md](services/ftth-design.md) | End-to-end fiber-to-the-home network design from HLD architecture through construction-ready LLD packages. |
| Pole Loading Analysis | https://draftech.com/services/pole-loading-analysis.html | [services/pole-loading-analysis.md](services/pole-loading-analysis.md) | NESC-compliant structural analysis, make-ready design, and joint use attachment applications for aerial fiber builds. |
| Permitting | https://draftech.com/services/permitting.html | [services/permitting.md](services/permitting.md) | Municipal ROW, state DOT, railroad crossing, NEPA environmental, and USACE permitting management for fiber deployments. |
| Field Survey | https://draftech.com/services/field-survey.html | [services/field-survey.md](services/field-survey.md) | GPS strand mapping, pole inventory, underground assessment, and route walkout data collection across 22 states. |
| CAD & GIS | https://draftech.com/services/cad-gis.html | [services/cad-gis.md](services/cad-gis.md) | AutoCAD, ArcGIS, QGIS, and MicroStation construction packages, route maps, splice diagrams, and permit drawing sets. |
| As-Built Documentation | https://draftech.com/services/as-built-documentation.html | [services/as-built-documentation.md](services/as-built-documentation.md) | Field-verified, GIS-integrated, BEAD-ready closeout documentation for fiber networks. |
| Traffic Control (MOT) | https://draftech.com/services/traffic-control.html | [services/traffic-control.md](services/traffic-control.md) | MUTCD-compliant maintenance of traffic plan design and lane closure permit coordination for fiber construction. |

---

## Blog — All 15 Articles

| Article | Canonical URL | MD File | Summary |
|---------|--------------|---------|---------|
| 5 FTTH HLD Design Mistakes | https://draftech.com/blog/ftth-hld-design-mistakes.html | [blog/ftth-hld-design-mistakes.md](blog/ftth-hld-design-mistakes.md) | The five most expensive FTTH high-level design errors — splitter ratio decisions, FDH sizing, NAP placement, optical budget skips, and make-ready timing. |
| Pole Loading Analysis with O-Calc Pro | https://draftech.com/blog/pole-loading-analysis-o-calc-pro.html | [blog/pole-loading-analysis-o-calc-pro.md](blog/pole-loading-analysis-o-calc-pro.md) | Complete technical guide to O-Calc Pro for NESC-compliant pole loading analysis on fiber attachments. |
| BEAD Engineering Requirements 2026 | https://draftech.com/blog/bead-funding-engineering-requirements-2026.html | [blog/bead-funding-engineering-requirements-2026.md](blog/bead-funding-engineering-requirements-2026.md) | What ISPs and subgrantees must prepare — engineering deliverables, documentation standards, and 2026 construction timelines for BEAD compliance. |
| GIS Fiber Network Planning Cost Reduction | https://draftech.com/blog/gis-fiber-network-planning-cost-reduction.html | [blog/gis-fiber-network-planning-cost-reduction.md](blog/gis-fiber-network-planning-cost-reduction.md) | How GIS-native design workflows reduce total deployment costs by approximately 30% through route optimization, automated BOQ, and reduced change orders. |
| ROW Permitting Delays | https://draftech.com/blog/row-permitting-delays-fiber-deployment.html | [blog/row-permitting-delays-fiber-deployment.md](blog/row-permitting-delays-fiber-deployment.md) | Seven strategies for cutting fiber permit approval time in half across municipal, county, DOT, railroad, and environmental jurisdictions. |
| Field Survey Data Accuracy | https://draftech.com/blog/field-survey-data-accuracy-fiber-construction.html | [blog/field-survey-data-accuracy-fiber-construction.md](blog/field-survey-data-accuracy-fiber-construction.md) | Why 90% of fiber construction change orders trace to field survey errors — the specific data points missed most often and how to prevent them. |
| FTTH LLD Splice Point Placement | https://draftech.com/blog/ftth-lld-splice-point-placement-guide.html | [blog/ftth-lld-splice-point-placement-guide.md](blog/ftth-lld-splice-point-placement-guide.md) | Complete guide to splice closure placement in FTTH low-level design — aerial vs. underground, access requirements, fiber count logic, and reel optimization. |
| Aerial vs. Underground Fiber Construction Cost | https://draftech.com/blog/aerial-vs-underground-fiber-construction-cost.html | [blog/aerial-vs-underground-fiber-construction-cost.md](blog/aerial-vs-underground-fiber-construction-cost.md) | Detailed cost comparison of aerial and underground fiber construction methods across terrain types, with per-mile ranges and decision frameworks. |
| Make-Ready Engineering Timeline | https://draftech.com/blog/make-ready-engineering-timeline-fiber-deployment.html | [blog/make-ready-engineering-timeline-fiber-deployment.md](blog/make-ready-engineering-timeline-fiber-deployment.md) | How to plan realistic make-ready timelines for aerial fiber deployments — utility review periods, sequencing, and scheduling strategies that keep builds on track. |
| NESC Pole Loading Compliance | https://draftech.com/blog/nesc-pole-loading-compliance-fiber-attachments.html | [blog/nesc-pole-loading-compliance-fiber-attachments.md](blog/nesc-pole-loading-compliance-fiber-attachments.md) | Technical breakdown of NESC Grade B loading requirements, overload capacity factors, and compliance documentation for telecom fiber attachments. |
| Railroad Crossing Permits | https://draftech.com/blog/railroad-crossing-permits-fiber-optic-construction.html | [blog/railroad-crossing-permits-fiber-optic-construction.md](blog/railroad-crossing-permits-fiber-optic-construction.md) | Step-by-step guide to obtaining railroad crossing licenses for fiber optic construction — Class I railroads, BNSF, CSX, Norfolk Southern, and UPRR. |
| Strand Mapping & Aerial Plant Assessment | https://draftech.com/blog/strand-mapping-aerial-plant-assessment-process.html | [blog/strand-mapping-aerial-plant-assessment-process.md](blog/strand-mapping-aerial-plant-assessment-process.md) | The complete strand mapping process for aerial fiber — what data to collect, tools to use, and how it feeds into design and make-ready engineering. |
| Fiber Construction Package Deliverables | https://draftech.com/blog/fiber-construction-package-deliverables-guide.html | [blog/fiber-construction-package-deliverables-guide.md](blog/fiber-construction-package-deliverables-guide.md) | What every complete fiber construction package must contain — drawings, schedules, splice plans, permit sets, and how each deliverable is used in the field. |
| Fiber Optic Construction Safety (OSHA) | https://draftech.com/blog/fiber-optic-construction-safety-osha-requirements.html | [blog/fiber-optic-construction-safety-osha-requirements.md](blog/fiber-optic-construction-safety-osha-requirements.md) | OSHA requirements for fiber optic construction crews — work zone safety, aerial work, excavation standards, and documentation requirements. |
| BEAD Subgrantee Engineering Compliance Checklist | https://draftech.com/blog/bead-subgrantee-engineering-compliance-checklist.html | [blog/bead-subgrantee-engineering-compliance-checklist.md](blog/bead-subgrantee-engineering-compliance-checklist.md) | Complete engineering compliance checklist for BEAD subgrantees — pre-construction, design, permitting, construction, and closeout documentation requirements. |
| Fiber Network As-Built GIS Documentation Standards | https://draftech.com/blog/fiber-network-as-built-gis-documentation-standards.html | [blog/fiber-network-as-built-gis-documentation-standards.md](blog/fiber-network-as-built-gis-documentation-standards.md) | Standards and best practices for fiber network as-built documentation in GIS — attribute schemas, coordinate precision, deliverable formats, and BEAD requirements. |

---

## LLMs & AI Access Files

| File | Description |
|------|-------------|
| [llms.txt](../llms.txt) | Standard llms.txt — primary AI access file listing all pages |
| [llms-full.txt](../llms-full.txt) | Extended llms.txt with full page content for AI systems |
| [llms-local.txt](../llms-local.txt) | Local development version of llms.txt |

---

## Who We Serve

- **Regional Fiber ISPs** — FTTH deployment, OSP design, make-ready engineering
- **National Carriers** — Large-scale network expansion and OSP support
- **Electric Co-ops** — Rural broadband deployment under USDA ReConnect and BEAD
- **BEAD Subgrantees** — Engineering, permitting, and documentation for NTIA-funded deployments
- **Municipalities** — Municipal broadband network design and permitting
- **Tower & Wireless Operators** — Fiber backhaul and fronthaul OSP design

---

## Contact

**Draftech International, LLC**  
15280 NW 79th CT, Suite 102  
Miami Lakes, FL 33016  

- **Phone:** 305-306-7406  
- **Email:** info@draftech.com  
- **Website:** https://draftech.com  
- **LinkedIn:** https://www.linkedin.com/company/draftechint
